|
As a CEO of Meta Engineering:
|
2011 till now
|
Consulting for premium automotive manufacturers
in Gothenburg, Turin, Rüsselsheim, Whitley, Stuttgart
Analysis of Diesel and Petrol engines in development phases |
- Cost analysis of the technical concepts
- Analysis/calculation of component costs
- Development of technical ideas/cost optimization measures
- Implementation of workshops for presentation and discussion of
relevant approaches
- Initiation of a cost tracking procedure
|
|
 |
Cost effective technical improvements |
|
|
|
|
09/2011 – 06/2012 |
Customer quality optimization of a convertible soft top
for a Bavarian premium car company |
- Weak point analysis of the production in Poland and the assembly in GB
- Recommendation and implementation of a QFD procedure
- Conceptual reorganization of the development, production and assembly
|
|
06/2010 – 05/2011 |
Structuring the development work of a piston
manufacturer in China
|
- Introducing CAE
- Introducing component test machines
- Representation towards customers
|
|
 |
Upgrading to Tier-1 |
|
|
|
|
02/2010 – 12/2012 |
Development of the engine development business division
|
- For a renowned engineering company in Munich
|
|
 |
Sustainable growth with motor vehicle manufacturers |
|
|
|
|
01/2009 – 12/2009
|
Project consulting of two Tier-2 suppliers
near São Paulo
|
- New development of a high pressure aluminum pump body
- Dimensioning with FE, test execution, release
- Cost-tracking and technical cost controlling
-
Controlling the sub-suppliers
|
|
 |
Offer price reduced by over 50% |
|
|
|
|
As a BMW Group employee:
|
|
05/2004 – 12/2008
|
Planning and Construction of a cost program for the reduction of the costs of parts in the development
of BMW engines
|
- Planning the Cost-tracking in cooperation with BMW-PSA for the development
of small engines
- Technical controlling
- Controlling the development in line with the parameters of Function, Quality
and in particular Costs
|
|
 |
An engine generation with many awards for function and quality |
|
|
|
|
04/2000 – 04/2004
|
Planning and implementation of the contract award for
the BMW-X3 to Magna Steyr AG & Co KG in Graz, Austria
|
- Planning the concept development for body, chassis
and driveline for BMW
- Planning the development for Magna
- Calculating the development and production costs and fixing
the target costs
- Negotiating the prices for the automotive development for Magna
- Drafting the development and supply contract
- Continuously controlling the cooperation
|
|
 |
Successful integration of the development philosophy of both companies.
Excellent and sustainable product performance |
|
|
|
|
01/1990 - 03/2000
|
Process-oriented design of engine parts among
the SE-Team of the BMW Group |
- piston rod
- crank case
- crank shaft
- cylinder head
- oil pump
- con-rod
- brackets
- etc.
|
|
 |
Significant improvement of component weights, failure rates and costs |
|
|
|
|
|